UPDATED: Construction Alert: Week of May 26, 2025

‼️UPDATED ‼️ CONSTRUCTION ALERT – Week of May 26, 2025 
Long-term intersection closure begins and traffic control is planned throughout the project area this week. 

TRAFFIC IMPACTS: 
⚠️  Long-term intersection closure begins at Jurupa Road and Felspar Street 
Tues., May 27, for 18 months | Businesses are OPEN during construction 

-Access to the Stater Bros. Shopping Plaza is available from Jurupa Road and Felspar Street 
-Access to the shopping plaza west of Felspar Street is available from Felspar Street 
-Please use the posted detours 

The closure is necessary to perform excavation, construct the railroad bridge, and adjust the intersection grade to connect with the Jurupa Road underpass. 
 
⚠️  Lane closures planned on Van Buren Boulevard outside NB lane 
Tues. – Sun. | May 27 – June 1 | 6 a.m. to 6 p.m. 
-Outside northbound lane closures planned from 52nd Street to Jurupa Connector Road to accommodate railroad track work 

⚠️  Jurupa Connector Road and Van Buren Boulevard traffic signal on flash 
Tues. and Wed. | May 27 and 28 | 9 a.m. to 4 p.m. 
-Intersection signals will be on flash with traffic control in place to install traffic signal equipment 
-All vehicles must STOP at the intersection 🛑 

This information may change due to weather or field conditions. 

Construction Hotline: 800-679-9570 
More info: www.JurupaGradeSeparation.com 

Construction Alert: Week of May 26, 2025

‼️CONSTRUCTION ALERT‼️ 
Tuesday, May 27, 2025 
⚠️ The intersection of Jurupa Road and Felspar Street will be closed for approximately 18 months for reconstruction as part of the Jurupa Grade Separation Project. 

TRAFFIC IMPACTS: 

  • Closure begins Tuesday, May 27 at 6 a.m. 
  • Intersection will be closed for approx. 18 months 
  • Use posted detours via Galena Street 
  • Access remains open to nearby shopping plazas from Jurupa Road and Felspar Street 

This closure is necessary to rebuild the intersection and adjust the grade for the new Jurupa Road underpass. 

This information may change due to weather or field conditions. 

Plan ahead and allow extra travel time. 

Construction Hotline: 800-679-9570 
More info: www.JurupaGradeSeparation.com 

Construction Update: May 12, 2025

⚠️ CONSTRUCTION ALERT⚠️


Week of May 12, 2025
Single lane closures are planned on northbound Van Buren Boulevard over the next two weeks—please use alternate routes.

TRAFFIC IMPACTS:
Northbound Van Buren Blvd (north of Limonite Ave to south of Jurupa Rd)
Wednesday, May 14
Monday–Friday, May 19–22
5 a.m. to 4 p.m.

– Closure needed for ongoing construction and oversized truck deliveries

– Crews continuing work on the railroad track

– Reduce speeds and watch for large trucks in and out of the project area

This information may change due to weather or field conditions.

Plan ahead, expect delays, and use alternate routes when possible.

Construction Hotline: 800-679-9570
More info: www.JurupaGradeSeparation.com

Construction Update: May 5, 2025

‼️CONSTRUCTION ALERT‼️

Week of May 5, 2025
Single lane closures are planned on northbound Van Buren Boulevard; please plan for delays.

TRAFFIC IMPACTS:
Northbound Van Buren Blvd (north of Limonite Ave to south of Jurupa Rd)

Monday, May 5 – Friday, May 9 | 5 a.m. to 4 p.m.

  • Closure needed for oversized truck deliveries
  • Crews delivering materials for railroad track work
  • Reduce speeds and watch for large trucks in and out of the project area

This information may change due to weather or field conditions.

Plan ahead, expect delays, and use alternate routes when possible.

Construction Hotline: 800-679-9570